  • Mobile crushing station, which is also called portable crusher, incorporates all the equipment together on one truck, which has high chassis, narrower body compared with other trucks, which ensures the crushing plant can be easily transported on highways and moved to crushing sites, so it is able to achieve on-site crushing without material transporting from one place to another place.

    Trucked mobile crusher is a kind of high efficient crushing equipment, using its own driving mode, advanced technology, complete functions. In any terrain conditions, this device can reach any position of the work site. This crusher machine can reduce the material processing operation, and is convenient for all auxiliary equipment coordination. Through the wireless remote control, can be very easily to the crusher to the trailer, and it is transported to the job site. Without the assembly time, so the equipment to work site can be put to work immediately. Mobile crusher broken than large, the optimum design can meet the needs of crusher technical characteristics, high productivity, product particle size uniformity.

    The maintenance of the quarry machine:

    1. Service life and operation rate, thus requiring into the lubricating oil must be clean, seal must be in good condition, the main oil at rotating bearing roller bearing,all the gear,movable bearing, sliding plane.

    2. On the device frame plane, should go out dust and dirt to avoid the stone breaking machine doesn't broken material activities in bottom bearing can not move, resulting in a serious accident.

    3. Bearing load the trucked mobile crusher full load, so the good lubrication on bearing life have a great relationship, it directly affects the mobile crusher making.

    4. The rotary gear in operation if the impact of noise check should be immediately stopped, and the elimination of.

    5. Check the easy wear parts wear, always pay attention to replace worn parts.

    6. The new installation of the tire are prone to loose must often be checked.

    7. Bearing temperature, stop and check the reason to be eliminated.

    8. Note that each part of the machine is working.

    If you have any question about the quarry equipemnt, welcome to contact with Honxing Machinery, and you will get the professional reply: sales@hxjq.com.

    rock crushers:http://www.china-cementmill.com/pp/rock-crusher.html

    Registered User
    avatar

New Reply

If you were logged in you would gain 3 XP for posting a reply.

Please respect our terms of use when participating in Nibbits.

Preview
Comment
We will show a masked version of your IP address as well as your name.

Support Nibbits by linking to us: